As per GERC | ||
Voltage | Sub Station Capacity | Short Circuit Current |
400 KV | Up to 1000 MVA | 40 KA (1 to 3 Sec) |
220 KV | Up to 320 MVA | 40 KA (1 to 3 Sec) |
132 KV | Up to 150 MVA | 32 KA (1 to 3 Sec) |
66 KV | Up to 80 MVA | 25 KA (1 to 3 Sec) |
33 KV | 1.5 MVA to 5 MVA | 35 KA (Urban) (1 to 3 Sec) |
11 KV | 150 KVA to 1.5 MVA | 25 KA (Rural) (1 to 3 Sec) |
415 V | 6 KVA to 150 KVA | 10 KA (1 to 3 Sec) |
220 V | Up to 6 KVA | 6 KA (1 to 3 Sec) |
Sub Station Capacity & Short Circuit Current Capacity:
As per Central Electricity Authority | ||
Voltage | Sub Station Capacity | Short Circuit Current |
765 KV | 4500 MVA | 31.5 KA for 1 Sec |
400 KV | 1500 MVA | 31.5 KA for 1 Sec |
220 KV | 500 MVA | 40 KA for 1 Sec |
110/132 KV | 150 MVA | 40 KA or 50 KA for 1 Sec |
66 KV | 75 MVA | 40 KA or 50 KA for 1 Sec |